Debut of the Cliffside bathroom upgrades

Last November, we announced that we were to begin the first phase of bathroom renovations for our Cliffside rooms. We finished the first phase this spring and so far have received rave reviews.

We couldn’t tackle the project all at once, but were able to update 21 of the 29 Cliffside rooms. Our Poolside rooms and the remainder of our Cliffside rooms are slated for the upgrade this winter.

We removed the wall between the vanity and bathroom doubling the size of the entire bathroom to approximately 70 square feet. In place of the bathtub we installed a large rain shower with a glass and limestone walls and river pebbles on the floor.

All bathrooms have double sinks in the new vanity and have a ¾-inch solid glass countertop. Two pendant lights hang in front of the mirror and recessed lighting for the rest of the bathroom.

Fired glass tiles adorn the accent wall behind the toilet bringing a bright, beachy feel to the bathroom.

Last but not least, we installed a solid glass ‘barn door’ style bathroom entrance door which slides on rollers on the outside of the wall!

Have you experienced one of the new Cliffside bathrooms? Let us know what you think by leaving a comment.


No comments:

Post a Comment